IPO

Afcons Infrastructure Ltd. IPO

Afcons Infrastructure Ltd., established in 1976, operates in the Construction, Contracting & Engineering sector. The company's IPO opened on October 25, 2024 and closed on October 29, 2024, with an ... Read more

Min Investment
₹ 14,816 / 32 shares
Price Range
₹440 - ₹ 463
Bidding Dates
25 Oct '24 - 29 Oct '24
Total Issue Value
5,430.00 Cr
Lot Size
32
Total Issue Size
5,430.00 Cr
Listing At
BSE, NSE
Subscription
2.77 times
BSE Price
545.85 (17.89%)
NSE Price
545.30 (17.78%)

IPO Timeline

  • 25 Oct 2024
    Bidding Starts
  • 29 Oct 2024
    Bidding Ends
  • 30 Oct 2024
    Allotment Finalization
  • 4 Nov 2024
    Listing

About Afcons Infrastructure Ltd.

We are the flagship infrastructure engineering and construction company of the Shapoorji Pallonji group (i.e., the group’s leading engineering and construction company). We have a strong track record of executing numerous technologically complex engineering, procurement and construction ... Read more

Parent organisation
Founded
Afcons Infrastructure Ltd.
1976

Afcons Infrastructure Ltd. IPO Reservation

Investors Category Shares Offered
Anchor Investors 3,50,21,598 (29.86%)
Employee Reserved 5,39,957 (0.46%)
Non Institutional Investors 1,75,10,799 (14.93%)
Qualified Institutional Buyers (QIBs) 2,33,47,732 (19.91%)
Retail Individual Investors (RIIs) 4,08,58,531 (34.84%)

Afcons Infrastructure Ltd. Financial Information

Year End Revenue PAT Reserves & Surplus
31 Mar 2024 13,285.34 Cr 442.12 Cr 2,734.55 Cr
31 Mar 2023 12,683.50 Cr 409.67 Cr 2,146.91 Cr
31 Mar 2022 10,792.51 Cr 259.30 Cr 1,716.85 Cr

Afcons Infrastructure Ltd. Background

We originally began our operations as a civil construction firm in 1959 as a partnership between the Rodio Foundation Engineering Limited, Switzerland and Hazarat & Company, India under the name of ‘Rodio Foundation Engineering Limited and Hazarat & Company’. The Partnership ...

Read more

Major Events And Milestones
  • 1959
    The partnership firm Rodio Foundation Engineering Limited, Switzerland and Hazarat & Company, India began operations as a civil construction firm
  • 1965
    Rodio Foundation Engineering Limited and Hazarat & Company, India commenced marine construction operations
  • 1974
    Entry of Rodio Foundation Engineering Limited and Hazarat & Company, India in the overseas market by construction of jetty and intake structure for desalination plant at Muscat
  • 1976
    Established as a company,‘Asia Foundations and Construction Private Limited’
  • 1977
    Acquired the business of Rodio Foundation Engineering Limited and Hazarat & Company, India through an Indenture dated March 22, 1977
  • 1979
    Commenced bridge construction operations
  • 1987
    Bagged our first project in Africa (Ethiopia)
  • 1988
    Entered road construction when large road projects funded by World Bank/ Asian Development Bank were put to tender
  • 1996
    Renamed as “Afcons Infrastructure Limited” due to major thrust in infrastructure related work
  • 2000
    Shares of the Company were acquired by Sterling Investment Corporation Limited, a Shapoorji Pallonji Group company.
    Commenced operations in the elevated metro segment project – construction of elevated structures (viaduct) Tis Hazari, Tri Nagar
  • 2001
    Crossed a total income of ₹3000 million
  • 2002
    Certified as ISO 9001:2000 by BVQI
  • 2003
    Bagged the Delhi Metro Barakhamba underground metro station contract
  • 2005
    Commenced operations in the hydro segment - Kol Dam Hydro Electric Power Project in the state of Himachal Pradesh
    Commenced operations in the rail tunnel segment – B.G. Single Line Tunnels, Katra-Laole section of Udhampur-Srinagar-Baramulla Rail Link Project
    Crossed a total income of ₹5000 million
  • 2006
    Bagged a project in Mauritius - Construction of Oil Jetty at Port Louis Harbour, Mauritius
  • 2007
    Crossed a total income of ₹10,000 million.
    Bagged the Vallarpadam Rail Bridge Project – an 8.86 km long rail corridor including 4.62 km longest railway bridge in India
  • 2008
    Bagged the project for developing the Nad Al Sheba Racecourse, United Arab Emirates
  • 2009
    Won first offshore oil & gas business project – ICPR Process Platform
    Bagged the Atal Tunnel Project at Rohtang–Recognized as ‘Longest Highway Tunnel above 10,000 feet’ by World Book of Records
  • 2010
    Had pending order book of more than ₹50,000 million
    Entered into underground metro tunnelling segment with Kolkata underground metro: India’s first underwater tunnel below river (Hooghly) river and India’s deepest metro station
    Bagged the Jammu-Udhampur 4-laning of NH-1A Project – One of the fastest hill road project completion in NHAI’s history
  • 2011
    Bagged two packages for design and construction of the Chennai Underground Metro Project.
  • 2013
    Crossed a total income of ₹30,000 million
  • 2014
    Bagged the construction project of T49B tunnel at Dharam-Udhampur-Srinagar Baramulla railway line (India’s longest railway tunnel)
    Bagged two packages in six-lane green field Agra Lucknow Expressway Project, UP – India’s longest access control expressway at the time of inauguration
  • 2015
    Crossed a total income of ₹40,000 million
    Had a pending order book of more than ₹110,000 million
    Bagged the Jawaharlal Nehru Port Trust Project India’s largest container port: Construction of Wharf and Approach trestle
  • 2016
    Entered into Turnkey Railway segment with Tema to Akosombo, Ghana Railway Project – Ghana’s largest railway project and the project includes longest railway bridge in the country
    Entered into Irrigation segment with Annaram Barrage Project – Part of Kaleshwaram Lift Irrigation Project (KLIP): World’s largest multi-stage lift irrigation project
    Bagged the Mahatma Gandhi Setu, Patna project
  • 2017
    Crossed a total income of ₹60,000 million
    Entered into International Water Supply segment – Extension of Water Transmission Pipeline from Lake Victoria to Tabora, Nzega and Igunga
  • 2018
    Had a pending order book of more than ₹200,000 million
    Bagged Package 2 and Package 14 of Nagpur-Mumbai Expressway (Maharashtra Samruddhi Mahamarg)
  • 2019
    Crossed a total income of ₹80,000 million
    Had a pending order book of more than ₹300,000 million
    Bagged the Kanpur elevated metro project
  • 2020
    Crossed the total income of ₹100,000 million
    Entered into Regional Rapid Rail Transit System (RRTS) segment – Bagged the Meerut RRTS Corridor
  • 2021
    Bagged the Greater Male Connectivity – Male to Thilafushi Link Project, Maldives–Biggest Infrastructure project in Maldives
  • 2022
    Entered into Domestic Water Supply segment
    Ranked amongst the top international contractors by ENR (Engineering News-Record, US):
    i) 10th largest international marine and port facilities contractor (only Indian company in top 25)
    ii) Ranked 12th in bridges sector in the world (only Indian company in top 25)
    iii) Ranked 42nd in transportation sector in the world (only Indian company in top 50)
    iv) Ranked 18th in transmission Lines and aqueducts in the world
    v) Ranked 43rd in Water Supply in the world
  • 2023
    Won C2 Tunnel Package for Mumbai Ahmedabad High Speed Rail– India’s first 7 km long undersea tunnel
    Entered into Onshore EPC Refinery Segment – Bagged the Crude Oil Terminal (COT) and associated facilities at Mundra, Gujarat
  • 2024
    Achieved a total income of more than ₹130,000 million
    Won Jamrani Dam Project – largest dam project of our Company in terms of project value
Afcons Infrastructure Ltd. Object of Issues

1. Capital expenditure towards purchase of construction equipment
2. Funding long term working capital requirements
3. Prepayment or scheduled repayment of a portion of certain outstanding borrowings and acceptances availed by our Company
4. General corporate purposes

Afcons Infrastructure Ltd. IPO Listing Details
Listing Date
4 Nov 2024
BSE Script Code
AFCONS
NSE Symbol
AFCONS
ISIN
INE101I01011
Final Issue Price
₹ 463
Afcons Infrastructure Ltd. Listing Day Trading Information
Pricing Details BSE NSE
Issue Price ₹ 463.00 ₹ 463.00
Open ₹ 430.05 ₹ 426.00
Low ₹ 419.85 ₹ 420.25
High ₹ 479.25 ₹ 479.45
Last Trade ₹ 474.55 ₹ 474.20
Afcons Infrastructure Ltd. Company Promoters

1. Goswami Infratech Private Limited
2. Shapoorji Pallonji and Company Private Limited
3. Floreat Investments Private Limited
4. Shapoorji Pallonji Mistry
5. Firoz Cyrus Mistry
6. Zahan Cyrus Mistry

Industry Overview

The global construction industry stood at approximately US$5.7 trillion as of 2023 and is expected to grow to US$7.8 trillion by 2029. Global construction industry growth will largely be driven by expanding construction investment in emerging markets. India is projected to remain the ... Read more

Afcons Infrastructure Ltd. IPO Registrar
Link Intime India Pvt. Ltd.
C-101, 1st Floor, 247 Park, Lal Bahadur Shashtri Marg, Vikhroli (West), Mumbai Maharashtra - 400083
8108114949
Afcons Infrastructure Ltd. IPO Lead Manager(s)
Jefferies India Pvt. Ltd.
16th Floor, Express Towers, Nariman Point, Mumbai Maharashtra - 400021
4356600

FAQs

When does Afcons Infrastructure Ltd. IPO opens and closes?

Afcons Infrastructure Ltd. IPO opens from 25th October to 29th October 2024.

What is the size of Afcons Infrastructure Ltd. IPO?

The size of the Afcons Infrastructure Ltd. IPO is ₹5,430.00 Cr.

What is the price range of Afcons Infrastructure Ltd. IPO?

The price range of Afcons Infrastructure Ltd. IPO is at ₹440 to ₹463 per share.

What is the minimum investment and lot size required for the Afcons Infrastructure Ltd. IPO?

The minimum investment required is ₹14,816 and minimum lot size is 32 shares.

When is Afcons Infrastructure Ltd. IPO listing date?

The Afcons Infrastructure Ltd. IPO will be listed on 4th November 2024.

What is the objective of Afcons Infrastructure Ltd. IPO?

1. Capital expenditure towards purchase of construction equipment
2. Funding long term working capital requirements
3. Prepayment or scheduled repayment of a portion of certain outstanding borrowings and acceptances availed by our Company
4. General corporate purposes

Disclaimer: This is 3rd Party content/feed, viewers are requested to use their discretion and conduct proper diligence before investing, GoodReturns does not take any liability on the genuineness and correctness of the information in this article

Notifications
Settings
Clear Notifications
Notifications
Use the toggle to switch on notifications
  • Block for 8 hours
  • Block for 12 hours
  • Block for 24 hours
  • Don't block
Gender
Select your Gender
  • Male
  • Female
  • Others
Age
Select your Age Range
  • Under 18
  • 18 to 25
  • 26 to 35
  • 36 to 45
  • 45 to 55
  • 55+