About German Green Steel & Power Ltd.
We are a vertically integrated iron and steel manufacturer primarily operating in the western region of India, with a presence in Gujarat with a main focus on TMT Bars (Source: CARE Report). We have two (2) manufacturing facilities located in the state of Gujarat (“Manufacturing Facilities”): one located at Samakhiyali (the “Samakhiyali Facility”) which is vertically integrated, and the other is located at Viramgam (“Viramgam Facility”) which is operated through our Material Subsidiary- German TMT Private Limited (formerly known as German TMX Private Limited).
German Green Steel & Power Ltd. IPO Reservation
| Investors Category | Shares Offered |
|---|---|
| Anchor Investors | 65,58,993 (30%) |
| Non Institutional Investors | 32,79,496 (15%) |
| Qualified Institutional Buyers (QIBs) | 43,72,662 (20%) |
| Retail Individual Investors (RIIs) | 76,52,158 (35%) |
German Green Steel & Power Ltd. Financial Information
| Year End | Revenue | PAT | Reserves & Surplus |
|---|---|---|---|
| 31 Mar 2025 | 1,037.32 Cr | 42.96 Cr | 177.48 Cr |
| 31 Mar 2024 | 1,137.54 Cr | 40.89 Cr | 146.14 Cr |
| 31 Mar 2023 | 1,130.20 Cr | 38.01 Cr | 118.86 Cr |
German Green Steel & Power Ltd. Background
-
2008Incorporation of our Company and commencement of operations
-
2018Acquisition of Samakhiyali Facility through liquidation process under the Insolvency and Bankruptcy Code, 2016 (“IBC”)
-
2019Commissioning of Samakhiyali Facility
-
2020Entered into a trademark license agreement with Shree Ganesh Rolling Mills (India) Limited for use of trademark “Jindal” for manufacturing of steel rebars
-
2023Commissioning of 4.24 MW wind solar hybrid project
-
2024Acquisition of 97.41% stake in German TMT Private Limited (formerly known as German TMX Private Limited) (material subsidiary)
-
2025Entered into a contract manufacturing agreement with JSW One Distribution Limited (“JODL”) to enable us to manufacture quality products (as defined in the agreement), which adhere to specifications, standards, quality assurance plan/ SOP laid down by JODL and the guidelines of BIS
Received Green certification for products manufactured at Samakhiyali Facility and Viramgam Facility
Forayed into selling of cut & bend and epoxy coated TMT Bars
1. Funding the capital expenditure requirements of our Company towards expansion of its manufacturing facility at Samakhiyali, Kutch, Gujarat and hybrid wind and solar power plant (“Project”)
2. Prepayment or re-payment, in full or in part, of certain outstanding borrowings availed by our Company
3. General corporate purposes
1. Abdulhaq Shamsulhaq Iraki
2. Inamulhaq Shamsulhaq Iraki
3. Ibrarulhaq Inamulhaq Iraki
Steel is a vital and versatile material that greatly enhances convenience in our lives. As a fundamental component in various manufacturing processes, it serves as the cornerstone for national economic growth. The steel sector is frequently regarded as a barometer of economic advancement due to ... Read more
FAQs
When does German Green Steel & Power Ltd. IPO opens and closes?
German Green Steel & Power Ltd. IPO opens from 25th September to 29th September 2026.What is the size of German Green Steel & Power Ltd. IPO?
The size of the German Green Steel & Power Ltd. IPO is ₹303.90 Cr.What is the price range of German Green Steel & Power Ltd. IPO?
The price range of German Green Steel & Power Ltd. IPO is at ₹132 to ₹139 per share.What is the minimum investment and lot size required for the German Green Steel & Power Ltd. IPO?
The minimum investment required is ₹14,873 and minimum lot size is 107 shares.When is German Green Steel & Power Ltd. IPO listing date?
The German Green Steel & Power Ltd. IPO will be listed on 5th October 2026.What is the objective of German Green Steel & Power Ltd. IPO?
1. Funding the capital expenditure requirements of our Company towards expansion of its manufacturing facility at Samakhiyali, Kutch, Gujarat and hybrid wind and solar power plant (“Project”)2. Prepayment or re-payment, in full or in part, of certain outstanding borrowings availed by our Company
3. General corporate purposes