Karamtara Engineering Ltd. IPO
IPO Timeline
-
9 Sep 2026Bidding Starts
-
11 Sep 2026Bidding Ends
-
15 Sep 2026Allotment Finalization
-
17 Sep 2026Listing
About Karamtara Engineering Ltd.
We are a backward integrated manufacturer of products for renewable energy and transmission lines sectors. We are the largest integrated manufacturer in terms of installed capacity in India for solar mounting structures and tracker components in Fiscal 2026 according to the F&S Report. Our aggregate installed capacity was 889,200 MTPA (including 492,000 MTPA for solar products equivalent to approximately 16.81 GW) and 480,000 pieces as of March 31, 2026 (excluding our galvanizing capacity). We offer a diverse product portfolio which enables us to serve as a one-stop shop for solar structures (fixed-tilt and trackers). We offer structures and fasteners in the solar energy and transmission sectors, and overhead transmission line (“OHTL”) hardware fittings and accessories. We were one of the largest exporters of solar products from India to North America in Fiscal 2025 (Source: F&S Report). We have also forayed into the wind energy sector by commencing production of angular towers for wind turbines and tubular towers for wind turbines in March 2025 and June 2025, respectively. Further, we intend to enter into the business of battery energy storage systems (“BESS”) through our wholly owned subsidiary (being Karamtara Green Energy Limited (“KGEL”)) that was incorporated in May 2025. In addition, we intend to set up manufacturing facilities for prefabricated engineered building (“PEB”) structures.
Karamtara Engineering Ltd. IPO Reservation
| Investors Category | Shares Offered |
|---|---|
| Anchor Investors | 1,03,34,646 (30%) |
| Non Institutional Investors | 51,67,323 (15%) |
| Qualified Institutional Buyers (QIBs) | 68,89,763 (20%) |
| Retail Individual Investors (RIIs) | 1,20,57,087 (35%) |
Karamtara Engineering Ltd. Background
-
1996Incorporation of our Company
-
1998We commenced manufacturing of transmission towers at our manufacturing facility(1) at Tarapur in Maharashtra, India
-
2004We set up a new manufacturing facility(2) at Tarapur in Maharashtra, India, through Karamtara Fasteners Private Limited, which has since been amalgamated into our Company
-
2006We commenced manufacturing of telecom towers at our manufacturing facility(1) at Tarapur in Maharashtra, India
-
2008We set up a new manufacturing facility(3) at Tarapur in Maharashtra, India, through Karamtara Steel Private Limited, which has since been amalgamated into our Company
-
2010We commenced manufacturing of 765kV class of transmission towers.
-
2011We acquired a structural steel profiles rolling mill(4) at Nagpur in Maharashtra, India.
Incorporation of our Subsidiary, Karamtara Italy SRL, in Italy
Our Subsidiary, Karamtara Italy SRL, acquired our indirect subsidiary, Iselfa Morsetteria SRL, including its manufacturing plant for hardware fittings and accessories in Milan, Italy
-
2013We commenced manufacturing of overhead transmission lines at Unit OHTL Fittings at Tarapur in Maharashtra, India
-
2015We commenced manufacturing of solar module mounting structures at Unit Solar MMS at Tarapur in Maharashtra, India
-
2017Incorporation of our Subsidiary, Karamtara USA Inc., in the United States of America
-
2019We commenced manufacturing of solar piers at Tarapur in Maharashtra, India
-
2023We commenced manufacturing of torque tubes for solar energy at our manufacturing facility(5) at Tarapur in Maharashtra, India
-
2024Incorporation of our Subsidiary, Karamtara Renewables Saudi Limited, in the Kingdom of Saudi Arabia
-
2025Incorporation of our Subsidiary, Karamtara Green Energy Limited
We commenced manufacturing of wind tubular towers at Taluka Bhachau, Kutch in Gujarat, India
We commenced manufacturing of angular towers for wind turbines at Tarapur in Maharashtra, India
-
2026Incorporation of our Subsidiary, Hanwant Manbir Singh Foundation, in India.
We commenced manufacturing of plates at Kumbhavali in Maharashtra, India.
We commenced manufacturing of solar module mounting structures at Bhachau in Gujarat, India.
1. Funding prepayment, repayment and/ or payment obligations to our lenders towards borrowings and Acceptances, in part or full
2. General corporate purposes
1. Tanveer Singh
2. Rajiv Singh
3. Inderjeet Singh
4. Inderjeet Tanveer Singh Trust
5. Inderjeet Rajiv Singh Trust
India’s installed electricity generation capacity has expanded dramatically since independence, not just in scale, but in the composition of sources. Growth in demand has been answered not only by thermal power (coal, gas, lignite) but increasingly through renewables, particularly solar and ... Read more
FAQs
When does Karamtara Engineering Ltd. IPO opens and closes?
Karamtara Engineering Ltd. IPO opens from 9th September to 11th September 2026.What is the size of Karamtara Engineering Ltd. IPO?
The size of the Karamtara Engineering Ltd. IPO is ₹875.00 Cr.What is the price range of Karamtara Engineering Ltd. IPO?
The price range of Karamtara Engineering Ltd. IPO is at ₹241 to ₹254 per share.What is the minimum investment and lot size required for the Karamtara Engineering Ltd. IPO?
The minimum investment required is ₹14,986 and minimum lot size is 59 shares.When is Karamtara Engineering Ltd. IPO listing date?
The Karamtara Engineering Ltd. IPO will be listed on 17th September 2026.What is the objective of Karamtara Engineering Ltd. IPO?
1. Funding prepayment, repayment and/ or payment obligations to our lenders towards borrowings and Acceptances, in part or full2. General corporate purposes
Disclaimer: This is 3rd Party content/feed, viewers are requested to use their discretion and conduct proper diligence before investing, GoodReturns does not take any liability on the genuineness and correctness of the information in this article


Click it and Unblock the Notifications
